CABIN GALLERY 3

THE BOTTOM AND THE TOP WERE ASSEMBLED

THE FLOOR WAS INSTALLED FOR THE TOP

A GENEROUS FILLING OF CELLULOSE INSULATION WAS INSTALLED

THE WALLS WERE INSULATED AND THE TOP WAS COMPLETED

NEXT >