CABIN GALLERY
INSULATION WAS INSTALLED AND BX STYLE CONDUIT AS WELL AS INTERIOR PLUMBING WAS PUT IN PLACE

INTERIOR TOUNGUE AND GROOVE PANELING WAS INSTALLED AND ALL WIRING WAS PULLED IN PLACE

ALL PANELING HAD A GENEROUS COAT OF LACQUER SPRAYED ON IT AND THE HEAT AND AIR UNIT WAS INSTALLED

CUSTOM BUILT CABINETS FRAMES WERE INSTALLED AND APPLIANCES WERE INSTALLED

A FULL SIZE WATER HEATER WAS FITTED BENEATH THE LOWER CABINETS

THE DOORS WERE STAINED AND FINISHED WITH SAND N SEAL AND COVERED WITH A VERY GENEROUS COATING OF URETHANE

CUSTOM STAIRS WERE BUILT AND INSTALLED

VIEW OF COMPLETED CABINETS

NOTE THE SPECIAL BAND AROUND THE EDGE OF THE TOPS
